Lin, Hsueh-Foo, Chang-Yung Liu, and Pin-Yang Liu, 1995, "A
Heuristic Approach to the Total Tardiness in Nonpreemptive Open-Shop Scheduling",
International Journal of Industrial Engineering, 2(1), pp. 25-33.
¼B»«¶§,¿½¤å®p,
1994,"¿ì¤½«Ç¦Û°Ê¤Æ¤§ºûÅ@¨Mµ¦¬ã¨s¡Ð¨t²Î¼ÒÀÀ¼Ò¦¡",
Proceedings of the Asia-Pacific IE Conferene and 1994 CIIE National Conference,
pp. 278-283.
Lin, Hsueh-Foo, Pin-Yang Liu, and Chang-Yung Liu, 1994, "A
Heuristic Solution to Total Tardiness and Earliness Penalities of an M-Machine
Nonpreemptive Open-Shop Schedule", Proceedings of the Asia-Pacific
IE Conferene and 1994 CIIE National Conference, pp. 367-372.
Ho, Chin-Fu, Pin-Yang Liu, and Ming-Hung Tsai, 1994, "An
EIS Framework for Distribution Center's Inventory Decision Support",
Proceedings of Automation *94, 6, pp. 281-286.
Liu, Pin-Yang, 1992, "Level Scheduling for Capacity Constrained
Mixed-Model Production Lines in Pull Systems", Dissertation of Auburn
University, AL, USA.
Liu, Pin-Yang, 1990, "A Heuristic Approach for Solving
Optimization Problems when Model Parameters Are Not Known with Certainty",
Thesis, Auburn University, AL, USA.